Tag Archive: bike trail

Plans moving ahead to close gap on Olympic Peninsula Trail

The goal of connecting Port Townsend with the rest of the Olympic Discovery Trail got a major boost last month when Jefferson County leaders voted to study the feasibility of possible trail routes linking the city to the rest of the trail.

The Olympic Discovery Trail is envisioned as a 126-mile-long bicycle trail along the …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2015/12/06/plans-moving-ahead-to-close-gap-on-olympic-peninsula-trail/

Snoqualmie Valley Trail segment closed all summer between Duvall and Carnation

Repairs to flood protection structures on the Snoqualmie River between Duvall and Carnation will force a closure on the popular Snoqualmie Valley Trail between now and Oct. 31.

Date of the closure is set to begin June 1, but crews already had the trail closed down today.

The work will block off-road access between Duvall …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2015/05/28/snoqualmie-valley-trail-segment-closed-all-summer-between-duvall-and-carnation/

Green River Trail reopens to bicycling in Kent

A central section of the Green River Trail that passes through Kent is now open for bicycle traffic, after being closed since March 2014. This is great timing, because it coincides with some spring-like weather this weekend.

If you’re looking to ride your bike someplace you haven’t visited in a while this weekend, then I’d …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2015/02/13/green-river-trail-reopens-to-bicycling-in-kent/

Cross Kirkland Corridor bike trail officially opens Saturday

The first section of rail-trail on the main stem of the old BNSF railroad corridor east of Seattle opens in Kirkland on Saturday as the city hosts a “Seahawks-style” celebration.

The official opening of the Cross Kirkland Corridor (see map) puts the city of Kirkland way ahead of its neighboring jurisdictions — King County, Bellevue, and …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2015/01/31/cross-kirkland-corridor-bike-trail-officially-opens-saturday/

Gaining access to orphaned section of Foothills Trail in Pierce County

It could be called “The Bike Trail to Nowhere.”

A 1.3-mile section of Pierce County’s scenic Foothills National Recreation Trail is paved, bridged and waiting for cyclists, hikers and horse riders. There’s just one hitch — there’s no good way to get to it.

Access from the trail in South Prairie in the west is blocked by private …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2014/10/26/gaining-access-to-orphaned-section-of-foothills-trail-in-pierce-county/

Whitehorse Trail washout will get FEMA funds

The 1-mile section of Whitehorse Trail washed out by the devastating Oso landslide in March will be restored with funds from the Federal Emergency Management Agency.

The rail-trail corridor rolls along the North Fork Stillaguamish River for 27 miles between Arlington and Darrington. The trail, still covered in the original railroad ballast, was damaged in …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2014/05/20/whitehorse-trail-washout-will-get-fema-funds/

Closed road through California’s Devil’s Slide reopens as bike trail

We’ve all heard about rails to trails. How about roads to trails?

That is what happened to the old Highway 1 through the scenic Devil’s Slide overlooking the Pacific Ocean.

The state last year moved Highway 1 (aka Cabrillo Highway) up the slope and through a set of tunnels. San Mateo County restored the old …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2014/04/02/closed-road-through-californias-devils-slide-reopens-as-bike-trail/

Bicycle projects in Seattle, Tacoma, Bellevue, Renton get federal funds

Several bicycle and pedestrian projects can go ahead now that the Puget Sound Regional Council on Thursday selected the projects for federal funding.

Among the biggest ticket construction items are the Prairie Line Trail ($1.9 million) in Tacoma, Overlake Village Bicycle and Pedestrian Bridge ($5 million) in Redmond, the Northrup Way Connection to the State …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2013/12/05/bicycle-projects-in-seattle-tacoma-bellevue-renton-get-federal-funds/

Centennial Trail ‘missing link’ construction begins in Arlington; bicycling detours available

Work has finally begun in Arlington on the last 1-mile interruption of the Centennial Trail as it rolls for some 30 miles from downtown Snohomish to the Skagit County line.

The construction on 67th Avenue Northeast should run off and on throughout the year and into early 2014. Crews started installing fencing and opening parts …

Continue reading »

Permanent link to this article: http://www.bikingbis.com/2013/04/16/centennial-trail-missing-link-construction-begins-in-arlington-bicycling-detours-available/